← Search

Liangliang Sun

3 accepted papers

2025

Integrated Electricity Strategic Bidding and Job-Shop Scheduling for Industrial Demand Response

RA-L 2025

It is important for a smart factory with substantial demand to jointly study its electricity strategic bidding and job-shop scheduling. However, the problem is complicated because job schedules constrained by manufacturing operations limit the bidding curves of demand response, which may influence t

Cited by 1SourceScholar
2022

An Efficient and Effective Approach for the Scheduling of Steelmaking-continuous Casting Process With Multi Different Refining Routes

RA-L 2022

With the rapid development of market-oriented demand of iron and steel enterprises towards multi variety, small batch and on-time delivery, the functional requirements of steelmaking-continuous casting (SCC) production process with multi different refining routes for the dynamic balance of logistics

Cited by 9SourceScholar
2018

Research on Scheduling of Iron and Steel Scrap Steelmaking and Continuous Casting Process Aiming at Power Saving and Carbon Emissions Reducing

RA-L 2018

Iron and steel scrap could substitute ironstone as the raw material for steelmaking and continuous casting (CC) production, and effectively reduce emissions of waste gas, water, and residue. The iron and steel scrap steelmaking and continuous casting (ISSSC) process is a compact production process i

Cited by 25SourceScholar