Near-Optimal Scheduling for IC Packaging Operations Considering Processing-Time Variations and Factory Practices
Due to the short life cycles of electronic products, trial run lots of new products are crucial in IC packaging for production verification and engineering adjustments. The processing time of trial run lots may differ significantly from production lots due to engineering adjustments and is difficult