Accurate and Adaptive in Situ Fabrication of an Undulated Wall Using an on-Board Visual Sensing System

ICRA 2018poster

In this paper we present a system for the in situ33In the context of building construction, “in situ” means that fabrication takes place at the structure's final location directly on the building site. fabrication of a full-scale, load-bearing, and doubly-curved steel reinforced concrete wall. Two c…

Cited by 57SourceScholar
2017

Design, development and experimental assessment of a robotic end-effector for non-standard concrete applications

ICRA 2017poster

Despite the recent advances in, and the adoption of robotic technologies in the construction industry, the architectural processes which demand a high degree of geometric freedom still remain largely labour intensive and manual. This is due to the inherent difficulties in robotizing the current impl…

Cited by 43SourceScholar